14–18 Sept 2026
CZU Prague, Czechia
UTC timezone

Estimating the Availability of Forest Biomass for energy considering the introduction of trailers into winding road networkds in mountainous areas of Japan

17 Sept 2026, 09:36
18m
L 201 - L201 (CZU Prague, Czechia)

L 201 - L201

CZU Prague, Czechia

50
Oral presentation Paralel session 4

Speaker

Prof. Kazuhiro Aruga (Utsunomiya University)

Description

This study estimated the availability of unused materials for woody biomass power generation plants registered in FIT (Feed-in Tariff) as the supply potential through the introduction of trailers with 20-t payload instead of trucks with 10-t payload which were widely used on winding road networks in mountainous areas of Japan. As a result, supply potentials of used and unused materials were estimated at 65,413,601 m3/year and 13,082,720 m3/year, whereas those availabilities were estimated at 64,322,304 m3/year and 12,864,461 m3/year, respectively. Therefore, the rate of the availabilities to the supply potentials was 98.3%. The availabilities of used and unused materials without the introduction were 54,268,941 m3/year and 10,853,788 m3/year. Thus, its introduction contributed to increase the availability. Since the demand of woody biomass power generation plants registered in FIT was estimated at 11,018,104 m3/year, the availability through the introduction met the future demands in Japan as a whole.

Keywords FIT; Payload; Supply potentials

Primary author

Prof. Kazuhiro Aruga (Utsunomiya University)

Presentation materials

There are no materials yet.